--- uid: input-system-existing-project-wide --- # Assign an existing action asset as project-wide To assign an existing actions asset as project-wide, do one of the following: 1. Go to **Edit** > **Project Settings** > **Input System Package** 2. Drag the asset from your Project window into the **Project-wide Actions** field. ![Screenshot of the Project Settings window, with Input System Package selected. Its settings are displayed on the right of the window. The Project-wide Actions field is empty, and an information box explaining you can assign an action asset as project-wide by selecting it in this field or creating it in this window is shown. A button to automatically create and assign the default project-wide action asset is displayed under the information box](./Images/InputSettingsNoProjectWideAsset.png)
*The Input System Package Project Settings with no project-wide actions assigned displays a button to create and assign a default project-wide action asset* or: 1. Select the Asset in your Project window 2. In the Inspector window, select **Assign as the Project-wide Input Actions**. Only one Actions Asset can be assigned as project-wide. If a different asset was previously assigned as project-wide, it becomes unassigned.