22 lines
1.2 KiB
Markdown
22 lines
1.2 KiB
Markdown
---
|
|
uid: input-system-existing-project-wide
|
|
---
|
|
|
|
# Assign an existing action asset as project-wide
|
|
|
|
To assign an existing actions asset as project-wide, do one of the following:
|
|
|
|
1. Go to **Edit** > **Project Settings** > **Input System Package**
|
|
2. Drag the asset from your Project window into the **Project-wide Actions** field.
|
|
|
|
</br>
|
|
*The Input System Package Project Settings with no project-wide actions assigned displays a button to create and assign a default project-wide action asset*
|
|
|
|
or:
|
|
|
|
1. Select the Asset in your Project window
|
|
2. In the Inspector window, select **Assign as the Project-wide Input Actions**.
|
|
|
|
|
|
Only one Actions Asset can be assigned as project-wide. If a different asset was previously assigned as project-wide, it becomes unassigned.
|